My contact person
Select location

After selection of your ZIP code, we designate the relevant staff to attend to you at once.

Assembly instructions for energy chain system E6.1

System E6.1 assembly Remove the opening cross bars by hand or screw driver. Repeat the process on the lower side
System E6.1 assembly Disassemble a total of 2 opening cross bars on each side to complete the separation
System E6.1 assembly Push the connection pin out using a screw driver. Repeat the process on the opposing side

System E6.1 assembly Rotate the energy chains apart until the interlocks between the chain links disengage. Repeat the process on the opposing side