Change Language :
Several E4.1 series energy chains were installed to guide the cables to the pipe laying tower and the tensioner on a pipe-laying vessel. They move the numerous cables safely and are comparatively light. And designed as pre-assembled readychain® energy chain systems, the operator saved installation time and costs.

In person
Monday to Friday: 7 am – 8 pm
Saturday: 8 am – 12 pm
Chat-Service
Monday to Thursday: 8 am – 6 pm
Friday: 8 am – 5 pm
WhatsApp-Service
Monday to Thursday: 8 am – 4 pm