A particular requirement in the design of this crane was noise reduction, as the harbour is located in the immediate vicinity of a residential area. Furthermore, a long service life of the energy supply and therefore reliability had to be guaranteed, as there is no other crane available at this location. Our P4 energy chain system is used here, which runs particularly smoothly and therefore quietly.

Download the case study
This case study clearly describes how EMO B.V. was able to achieve running performances of over 375,000km on its STS cranes with igus chains for cranes.